Phoenix Sky Harbor Terminal 3 Modernization

  • DESCRIPTION: Fabrication and erection of approximately 1600 tons structural steel, standard galvanized deck along with Long span (30 feet) finish painted 7-1/2 steel roof deck. Heavy HSS exterior galvanized structural stairs (delegated design) including powder coated railings and precast treads. 230,000 square feet.
  • Location: Phoenix, AZ
  • Year: 2018
Posted in